Office building as a duplicate part
Projektinfo 13/2007
 

Fig. 1: The new office building lies on the edge of a “solar housing estate” in the German town of Aachen and follows the energy specifications for the residential buildings of the estate.
© Jörg Hempel, Aachen

© Jörg Hempel, Aachen

Efficient office building with flexible room concept

Nowadays, the question of heating costs for new residential buildings is often a central matter. For office buildings, high quality of the workplace is normally of main importance, along with the consideration of cooling the building. This does not mean, however, that the construction costs and follow-up have to be high. For office buildings too, energy-optimisation does not just lead to low operating costs but also provides a high level of interior comfort. In Aachen, the concept of a solar housing estate induced its planners to fulfil the same energy requirements for their own new neighbouring office building. In addition, the building was supposed to be particularly economical to create and run.

In the concept phase, the costs that are expected over the entire construction and usage period were broken down completely, evaluated and optimised. The more expensive planning process beforehand is paying off -  low follow up costs and highly flexible usage promise to secure the investment in the long term. Since, in this case, the contractors planned and are also now using the building themselves, they all acted in concert. The integral planning approach, a basic requirement for a sustainable, energy-efficient concept, was considerably easier to perform compared to other projects.
The spacious floor plan without load-bearing interior walls allow the building to be sub-divided variably into different units and various office shapes.

Bild 1 - projekt 1307 01: Fig. 1: The new office building lies on the edge of a “solar housing estate” in the German town of Aachen and follows the energy specifications for the residential buildings of the estate.
Copyright: Jörg Hempel, Aachen
Bild 2 - projekt 1307 01b:
Copyright: Jörg Hempel, Aachen
Bild 3 - projekt 1307 02 engl: Fig. 2: Building summary
Copyright: BINE Informationsdienst
Bild 4 - projekt 1307 03: Fig. 3: Standard storey floor plan
Copyright: Hahn Helten, Aachen
Bild 5 - projekt 1307 04: Fig. 4: One of the meeting rooms without measures to improve room acoustics
Copyright: Jörg Hempel, Aachen
Bild 6 - projekt 1307 04b engl: Fig. 4b: Energy concept: System components
Copyright: BINE Informationsdienst
Bild 7 - projekt 1307 05 engl: Fig. 5: Energy characteristic relating to heated NFA
Copyright: BINE Informationsdienst
 :
Copyright:
arrow
arrow

The energy concept which relies primarily on the use of geothermal heat or cooling in conjunction with a heat pump is kept simple. The integration of the building services equipment into the ceiling or floor offers much flexibility for how to use the interior space. From the very beginning, the office building in Aachen was meant to be more than a one-off experiment. The concept is to be converted into a “product series” so that planning costs are reduced and the experience gained previously can be benefited from.
The office has been in use since summer 2002. A subsequent monitoring process was sponsored by the German Federal Ministry of Economics and Technology in the scope of the key research area, EnOB - "Energy-Optimised Construction". Evaluating several hundred measurement points over a five-year period has played a decisive role in ensuring that the building can now produce such good characteristic value. The evaluation will therefore be continued.

Overview of contents Projektinfo 13/2007:
Page 1 of 8

BINE subscription

Pfeil Subscribe to publication

Adressen

Gesamtplanung und Produktentwicklung
Balanced Office Building GmbH

Gebäudetechnik/Simulation
VIKA Ingenieur GmbH

Wissenschaftliche Begleitung
b+tga, Uni Wuppertal